环氧树脂地坪施工要点
Main points of epoxy floor application
素地处理:
Base concrete preparation:
1、基础素地以水泥粉光面或磨石地为准;
Use the polished cement surface or ground cement surface as the standard of base concrete.
2、素地需养护28天以上,水分需在8%以下方可施工素地如有不平或空鼓需加已剔除,并重新修补施工。
Base concrete should be maintained more than 28 days. If the water concentration in the base concrete is morte than 8%, epoxy floor coating can not be applied. If the base concrete is not flat and has hollowing, they must be removed and repaired.
3、用环氧砂浆补平地面;
Flatten the base concrete with epoxy motar.
4、素地被油污污染需彻底清洗干净;
Thorough cleaning is required if the base concrete is stained with oil and fat.
5、施工前需保持施工素地干燥和清洁。
Keep the base concrete dry and clean before application.
底涂层:
Primer:
1、施工前需保持干净,如有杂物粘附需清除依照正确比例将色剂及固化剂混合,充分搅拌均匀;
Keep the base concrete clean. If the base concrete is polluted, the pollutant must be cleaned. Mix A and B parts with a right mixing ratio. Thorough mixing is required..
2、需视地面情况调整适当粘度,混合材料施工应在4小时以内使用;
Adjust the viscosity of the mixed paint depending upon the situation of the base concrete. The mixed paint should be used up within 4 hours.
3、底涂层养护硬化时间约为8小时以上。
The curing time of the primer should be more than 8 hours.
中涂层:
Mid-coat:
1、施工前需要保持干净,如有杂物粘附需清除依照正确比例将主剂及固化剂混合,充分搅拌均匀;
Keep the primer clean. If the primer is polluted, the pollutant must be cleaned. Mix A and B parts with a right mixing ratio. Thorough mixing is required.
2、将混合完成的树脂适量加入石英砂;
Add an dequate amount of silica sand in the mixed resins.
3、使用镘刀将材料均匀涂布;
Apply the mixed material evenly with a trowel.
4、混合完成材料需30分钟以内施工完毕;
The mixed material should be used up within 30 minutes.
5、施工交接处应做好交接处理;
Overlapping should be done according to special requirement.
6、中涂层养护硬化时间约为8小时以上;
The curing time of the mid-coat should be more than 8 hours.
批刮腻子层:
Apply a putty layer:
1、依照正确比例将主剂及固化剂混合,充分搅拌均匀;
Mix A and B parts with a right mixing ratio. And a thorough mixing is required.
2、使用批刀将材料涂布均匀;
Apply the mixed material evenly with a spatula.
3、混合完成材料需30分钟内施工完毕;
The mixed material should be used up within 30 minutes.
4、腻子养护硬化时间约8小时以上;
The curing time of the putty is more than 8 hours.
5、视实际需要施工数道要求达到平整无孔洞,无镘刀印及砂磨印为准。
Probably a few coats should be applied to have a flat surface and remove hollowing depending on the actual situation. No marks of trowel and sand abrasion are left.
面涂层:
Topcoat
1、施工前需保持干净,如有杂物粘附需清除;
Keep clean the surface to be coated. If the surface is polluted, the pollutant should be cleaned thoroughly.
2、使用前色剂先搅拌均匀;
The coloured paint should be agitated thoroughly before use.
3、依照正确比例将色剂及固化剂混合,充分搅拌均匀;
Mix the coloured paint and curing agent with a right mixing ratio. Thorough mixing is required.
4、使用滚筒或镘刀将材料均匀涂布混合完成材料需在30分钟以内施工完毕;
Apply the mixed material evenly with a roller or trowel. The mixed material should be used up within 30 minute.
5、施工交接处应做好交接处理;
Overlapping should be done according to special requirement.
6、施工完成后,24小时后方可上人,72小时后方可重压(以25℃为准,低温时开放时间需适度延长)。
Foot traffic can be done 24 hours after finishing application. Heavy pressure can be imposed 72 hours after finishing application ( at 25℃, open time can be extended at a low temperature.)
江门市卡托化工有限公司是集研究,生产高级化工建筑材料于一体的中外合资企业。本公司生产基地占地30,000余平方米,毗邻西部沿海高速公路,水陆交通方便,地理条件优越,并具有雄厚的科研技术力量,拥有多名博士,硕士化工专业研究人员,进行产品的研究和开发,并与国外多家化工建筑材料研究所长期合作,应用先进技术,不断提高产品的档次,引领潮流,带动市场。

全国免费热线:4000 7888 48
业务洽谈热线:13827059919
目前本公司主要产品有五大系列:
(1)工业地坪材料及工程:环氧树脂地坪、环氧防静电地坪、地面硬化剂、导静电防火花地面硬化剂、自流平水泥、重防腐地坪、自流平硬化剂、混凝土密封剂等各种配套地坪;
(2)体育场地设施材料及工程:体育场、田径场地、合成面层网球场、篮球场、排球场、羽毛球场、幼儿园场地、人工草坪球场、橄榄球场、塑胶跑道、PU球场、亚克力球场等;
(3)灌浆材料:普通型灌浆料、超细水泥灌浆料、环氧树脂灌注料、聚氨脂灌注料、环氧植筋胶等;
(4)彩模地坪材料及施工:压模地坪、纸模地坪、喷涂地坪等;
(5)胶粘剂及特种材料:马赛克纤维网粘合剂、聚氨脂填缝料、聚氨脂密封胶、聚硫密封胶、耐酸碱环氧胶泥、耐酸碱环氧腻子、焦油改性环氧防滑层、聚合物修补砂浆、非焦油聚氨脂防水涂料、水性环氧防水封闭层、刚性/柔性聚合物防水涂料等。
【江门卡托地坪】部分产品目录:







江门市卡托化工有限公司具有雄厚的科研技术力量,拥有多名博士、硕士化工专业研究人员,进行产品的研究和开发,并与澳洲及我国多家著名化工建筑材料研究所长期合作,应用先进技术,不断提高产品的档次,引领潮流,带动市场。本公司为了更好的开拓市场,打开销路,诚意邀请你的加盟。我们的合作必将为您带来前所未有的丰厚利益回报。
合作方式分类
合作方式共分为四类(前三类为经销代理商,D类为信息合作者):
A类:卖场销售产品,展示产品广告,同时代理承接地坪工程。
B类:只展示产品广告,同时代理油漆产品的销售承接地坪工程。
C类:此类经销商为区域独家代理商,既销售公司产品,又展示公司产品广告,同时代理承接该区域内的地坪工程。
D类:此类合作者为信息合作者,所反馈的信息工程签单后可按规定获得相应工程酬金。
在地坪产品的销售或使用过程中,公司可应客户要求提供免费上门技术服务和现场施工指导。所有负责施工的地坪工程,均实行一年免费维护、终身保修。
卡托工程实例



| 部分工程(5000㎡以下省略) | ||
本田汽车(中国)有限公司 | 非金属地面硬化剂 | 62000㎡ |
江门市大冶摩托车厂房 | 环氧砂浆薄涂 | 65000㎡ |
珠海永宝塑料厂房 | 非金属地面硬化剂 | 50000㎡ |
亚铝氧化A、B、C车间 | 地面硬化剂 | 34000㎡ |
广东万和新电气有限公司 | 金属地面硬化剂 | 27300㎡ |
佛山市三水凤铝铝业有限公司 | 金属地面硬化剂 | 21900㎡ |
广东新广国际集团有限公司 | 金属地面硬化剂 | 20000㎡ |
丰华针纺厂四号成品仓 | 地面硬化剂 | 20000㎡ |
东莞理工学院图书馆 | 环氧砂浆薄涂 | 15000㎡ |
顺德高明万和健康电器厂房 | 金属地面硬化剂 | 15000㎡ |
诺斯贝尔无纺布制品有限公司 | 非金属地面硬化剂 | 14600㎡ |
中山市联昌喷雾有限公司 | 混凝土工艺 | 13000㎡ |
威捷汽车装饰工程 | 金属地面硬化剂 | 12000㎡ |
佛山市科星电子有限公司 | 地面硬化剂 | 11000㎡ |
中山市环亚塑料包装有限公司 | 环氧砂浆薄涂地坪 | 10000㎡ |
珠海伟创力B7扩建工程 | 混凝土工艺 | 9000㎡ |
新会区冠华针织有限公司 | 非金属地面硬化剂 | 8200㎡ |
江门朝杨机械有限公司 | 环氧薄涂地坪 | 7200㎡ |
北京大北农饲料集团 | 金属地面硬化剂 | 7000㎡ |
广州MPC国际钢构有限公司 | 金属地面硬化剂 | 6300㎡ |
广州金德4#、5#厂房工程 | 耐磨地坪 | 5400㎡ |
广州天生集团 | 非金属耐磨地坪 | 5000㎡ |
广州市美邦祈富文仪有限公司 | 金属耐磨地坪 | 5000㎡ |
珠海荔山工业区东光电子厂 | 环氧薄涂地坪 | 5000㎡ |
丙烯酸篮球场 |
| 2230㎡ |
东莞信义玻璃有限公司 | 金属耐磨地坪 | 145000㎡ |
| 台山捷德纺织有限公司 | 金属地面硬化剂 | 80000㎡ |
| 东莞台玻华南玻璃有限公司 | 金刚砂耐磨地坪 | 45000㎡ |
| 维达纸业(江门)有限公司 | 金刚砂耐磨地坪 | 60000㎡ |
| 鹤山市真明丽灯饰有限公司 | 进口铬绿耐磨地坪 | 50000㎡ |
| 恒福新城 | 地下停车场环氧地坪 | 15000㎡ |
| 天湖郦都 | 地下停车场环氧地坪 | 12000㎡ |
| 柳州乘龙汽车公司 | 原色金属硬化剂 | 30000㎡ |
| 宾阳大桥纸厂 | 原色金属地面硬化剂 | 40000㎡ |
| 云南昆明铁建集团设备仓库 | 混凝土密封固化剂 | 70000㎡ |
全国免费热线:4000 7888 48
业务洽谈热线:13827059919