推荐施工方式:刷涂或喷涂。面漆建议用喷涂施工,漆膜效果更佳。
施工工艺:涂装工艺(以水曲柳板为例)
耗漆量(理论值):面漆:8-10平方米/公斤(混合液,刷涂一遍的耗量)
底漆:5-7平方米/公斤(混合液,喷涂一遍的耗量) (因基材、涂料颜色和效果不同,耗漆量会有所不同)
干燥时间(温度25℃、相对湿度75%):表干时间小于60分钟 实干时间12小时
可使用时间(温度25℃、相对温度75%):油漆混合后应在4小时以内用完。
重涂时间(温度25℃、相对湿度75%): 如果采用湿喷湿涂饰方法,在漆膜表干以后马上重涂,中间无需打磨。但底 漆施工4小时,面漆施工8小时后如果还要进行下步涂装,则必须对涂层进行 打磨,以增加漆膜间的附着力。
施工注意事项: ①配漆时,将罐内油漆充分搅拌均匀,按规定比例调配,再次搅拌均匀,静 置10分钟后过滤使用。 ②请将被涂物表面的灰尘、颗粒清理干净,再涂饰下一道漆。 ③开罐后若油漆不能一次用完则必须即时密封。 ④请配套使用本公司产品,以免引起不良反应。 ⑤请根据温度的变化选择配套的稀释剂。 ⑥基材的含水率应与当地的平衡含水率相当,表面要求干燥清洁。 ⑦施工时应配戴防护用具,并保持良好通风。 ⑧请根据施工难度和漆膜效果及时改变稀释的加入量。
储存方式:密闭存于阴凉干燥处,远离明火及热源。
符合国家标准:GB18581-2001
Recommended construction method: Brush or spray. Spray paint is recommended, the film better. Construction Technology: coating process (as Ash board as an example) Consumption of paint (theoretical): finish 8-10 square meters / kg (the mixture, brush over the consumption) Primer :5-7 sq m / kg (the mixture, spraying over the consumption) (Due to the substrate, coating with different colors and effects, the consumption of paint will vary) Drying time (temperature 25 ℃, relative humidity 75%): dry time of less than 12 hours, 60 minutes drying time Can use the time (temperature 25 ℃, relative humidity 75%): paint mixture should be used within 4 hours. Recoat time (temperature 25 ℃, relative humidity 75%): If the wet-jet wet coating method, immediately after the film is dry coating weight, in the middle without polishing. But at the end Construction paint 4 hours, 8 hours after the finish the construction but also the next step if the coating, the coating must be Polished, in order to increase the adhesion between the film. Construction Notes: ① with paint, paint the tank, stir, according to the provisions of the proportion of allocation, stir again, the static 10 minutes after the filter is set to use. ② Please be coated surface of the dust particles to clean up, and then finishing the next coat of paint. ③ If the paint can that can not run out of time must be immediately sealed. ④ Please supporting the use of our products, so as to avoid adverse reactions. ⑤ Please select the package according to the temperature change of the diluent. ⑥ the moisture content of the substrate should be fairly local equilibrium moisture content, surface requires dry and clean. ⑦ construction should wear protective equipment, and maintain good ventilation. ⑧ film according to difficulty of construction and the addition of dilution effect of changes in the amount of time. Storage: kept in a cool dry place sealed, away from open flame and heat. Meet the national standard: GB18581-2001
'