一、产品用途:广泛用于建筑、市政、地铁、隧道、机场跑道、高速公路、桥梁等工程中砼伸缩缝,沉降缝等变形缝的嵌缝密封。适用于水厂、游泳池、蓄水池、电站、拦水坝、污水处理工程及供排水系统等工程中各类伸缩缝防渗漏嵌缝密封。
A, product use: widely used in construction, municipal, subway, tunnel, airport runway, highway, bridge engineering concrete expansion seam, settlement joints deformation crack sealing seal. Is suitable for water, swimming pools, reservoirs, dams, power plants, sewage treatment works and water supply and drainage system engineering in all kinds of expansion joint leakage sealing seal.
二:产品使用说明
Two: instructions for use of the product
(一)、本品为双组份膏状物,两组份有明显色差,便于混合均匀。使用比例为A:B=100:8-12,可施胶时间为2-6小时。产品属中性,无毒、无污染、防腐、防菌、耐水、耐油、耐弱酸碱,抗老化性能优越。使用寿命长,具有卓越的防渗漏粘接密封性能。
(1) this product is a two-component paste, the two components have obvious color difference, easy to mix evenly. The application ratio is A:B=100:8-12, and the sizing time is 2-6 hours. The product is a neutral, non-toxic, no pollution, corrosion, bacteria, water resistance, oil resistance, weak acid, anti aging performance. Long service life, excellent anti leakage adhesive sealing performance.
(二)、使用前建筑物必须保持干燥、干净、无油污。(可用喷灯、热风机吹干)
(two) the building must be dry, clean and oil free before use. (available, hot air dryer burner)
(三)、在施工时应先将底涂液涂于表面,待表面干燥后把缝隙的两边10mm处贴上50mm宽的防护胶带,以防施工中多余的聚硫胶把构筑物表面弄脏。
(three) in the construction, the bottom coating solution should be applied to the surface, and after drying the surface, 50mm wide protective tape is attached to the 10mm on both sides of the crevice, so as to prevent the superfluous polysulfide glue in the construction to contaminate the surface of the structure.
(四)、把箱内1桶白色聚硫胶(A组份)与1袋黑色固化剂(B组份)充分搅拌均匀,直到无色差为止。(注:因气候不同B组份应冬季多、夏季少)A:B=100:8-12,用前应先做小试。
(four) mixing 1 barrels of white polysulfide glue (A component) with 1 bags of black curing agent (B component) in the box until the color difference does not exist. (Note: due to the different climate, B group should be more winter, Xia Jishao) A:B=100:8-12, should be tested before use.
(五)、把搅拌好的聚硫密封胶用灰刀或挤胶枪填入缝内压实填满,再用≥10cm宽腻子刀把胶刮平。
(five), the polysulfide sealant with a putty knife or squeeze the glue gun to fill the slot fill compaction stir well, and then more than 10cm wide glue scraping putty knife.
(六)、施平胶后把防护胶带取下即可,24小时内应避免水冲雨淋。(表干时间≤24小时,7天后方可灌水试验,28天性能全部达到。)
(six) the rubber tape can be removed after leveling, and the water should be washed and dried within 24 hours. (dry time less than 24 hours, 7 days before irrigation experiment, 28 days to meet all the performance.)
(七)、配制好的聚硫胶应在两小时内用完,否则会因膏慢慢固化而造成施工困难,避免浪费。
(seven) the prepared polysulfide adhesive should be used within two hours, otherwise it will be difficult to be constructed due to the slow curing of the paste and avoid waste.