柴油发电机组安装地的周围应保持清洁,避免在附近放置能产生酸性、碱性等腐蚀性气体和蒸汽的物品。有条件的应配置灭火装置。
The diesel generating set should be kept clean around the installation ground to avoid placing objects that can produce acidic, alkaline and other corrosive gases and steam in the vicinity. Fire extinguishing equipment should be equipped with conditions.
发电机组外壳必须有可靠的保护接地,对需要有中性点直接接地的发电机,则必须由专业人员进行中性接地,并配置防雷装置,严禁利用市电的接地装置进行中性点直接接地。与市电的双向开关必须十分可靠,以防倒送电。双向开关的接线可靠性需经过当地供电部门的检验认可。
The shell of generator set must have reliable protection and grounding. For a generator directly grounded, it must be grounded by professional personnel and equipped with lightning protection device. It is strictly prohibited to use the grounding device of power supply to directly connect neutral point. The two-way switch with the city electricity must be very reliable to prevent power supply. The connection reliability of the two-way switch needs to be approved by the local power supply department.
柴油发电机组安装地点需通风良好,发电机端应有足够的进风口,柴油机端应有良好的出风口。出风口面积应大于水箱面积1.5倍以上。老款的柴油发电机组需采用混凝土做基础,在安装时须用水平尺测其水平度,使机组固定于水平的基础上。机组与基础之间应有专用防震垫或用底脚螺栓。而现代的柴油发电机不需要混凝土做基础,因为现代的柴油发电组已经过改进,整个机组地面都是平的,并且都装有减振器,非常的方便。
The installation site of the diesel generator set needs to be well ventilated, the generator end should have enough inlet air inlet, and the diesel engine end should have a good outlet. The air outlet area should be more than 1.5 times more than the water tank area. The old type diesel generating set should be based on concrete, and the horizontal scale must be measured with a horizontal ruler in the installation, so that the unit is fixed on the basis of the level. Between the unit and the foundation shall have a special cushion or foot bolt. The modern diesel generator does not need concrete as the foundation, because the modern diesel generator set has been improved, the whole generating unit is flat, and equipped with shock absorber, which is very convenient.
在室内使用,必须将排烟管道通导室外,管径必须消音器的出烟管直径,所接之管路的弯头不宜超过3个,以保证排烟畅通,并应将管子向下倾斜5-10度,避免雨水注入;若排气管时垂直向上安装的,则必须加装防雨罩。
In the interior, the exhaust pipe must be conducted outside diameter must muffler smoke pipe diameter, pipe elbows should not take more than 3, to ensure the smooth exhaust, and the pipe should be downward sloping 5-10 degrees, avoid rainwater injection; if the exhaust pipe for vertical installation, you must install the rain cover.