产品用途
适用于室内墙面、天花板、混凝土、灰浆墙和经打底的各类板材表面。典型油漆系统
底漆:内墙抗碱底漆(一层)
面漆:健康墙面漆(二层)施工指南
施工方法:刷、辊、喷涂均可(不同的施工方法,注意适当的稀释比)。
稀释比例:加10-20%的清水稀释,并搅拌均匀,静置消泡后施工。
颜色:丰富多彩,请参阅爱德华色卡。
基材处理:基材必须、稳固、清洁、含水率<10%、PH值<10.
漆膜保护:表干30分钟(25℃);漆膜干透7天(25℃、温度<80%).
重涂间隔:依环境的实际情况2-8小时.
理论涂刷面积:11-12平方米/公升/遍.注意事项
温度低于5℃,温度大于80%的天气不宜施工;
避免与油性产品同时施工;
施工时尽量避免皮肤接触,喷涂时请配套戴防护用具,以免吸入漆雾;
施工工具、器皿用清水清洗干净.Usage
Suitable for indoor walls, ceilings, concrete, mortar walls and by rendering the surface of various types of plates.Typical paint system
Primer: interior alkali primer (floor)
Finish: Health wall paint (second floor)Construction Guide
Construction method: brush, roller, spray can (different construction methods, pay attention to the appropriate dilution ratio).
Dilution ratio: 10-20% increase of fresh water dilution, and mixing evenly, put it aside, after defoaming construction.
Color: varied, see Edward color cards.
Substrate processing: substrate must be, secure, clean, moisture <10%, PH value of "10.
Film protection: dry 30 minutes (25 ℃); paint dry 7 days (25 ℃, the temperature "80%).
Re-coating interval: according to the actual situation of the environment 2-8 hours.
Theory Brushing Area :11-12 square meters / L / times.Notes
Temperature below 5 ℃, the temperature is greater than 80% of the weather, not construction;
To avoid the simultaneous construction of oil products;
During the construction to avoid skin contact, spraying wear protective equipment when you complete in order to avoid inhalation of mist;
Construction tools, utensils, wash with water.