DLC灯管 LED灯管T8灯管 DLC UL ERP认证 ULLED灯管
'
| S-Tube is an upgraded version CFL tube replacement with LED. It has the best configuration of brightness and power efficiency. S-tube is designed to replace medium bi-pin T8 and T12 fluorescent tubes. S-tube fits directly into most fluorescent fixtures providing a simple upgrade to high quality LED lighting. S-tube is optimized to provide light outputs comparable to fluorescent and delivers the immediate benefits of white-LED lighting; long lifetimes, no maintenance, high efficency, no mercury, no recycling, no flickering, no buzzing, instant start, cold temperature operation, and high quality light. It provides energy savings of up to 75% over fluorescent applications that require long hours with low occupancy rates such as stairwells, corridors, warehouses, and remote locations. The high quality S-tube replacement tube is constructed from extruded aluminum to provide a virtually unbreakable, vandal proof lighting solution. |
| |
|
Type | Model number | LED Type | Color | Voltage | Length (cm) | Power(W) | CRI | Light output (lm±10%) | LED Q’ty | PF | Frosted | ST8-009-AW-WW-01F | SMD 2835 | Warm White | AC100-240V 50/60Hz MAX.277V (DC 12/24V available) | 60 | 9 | ≥80 | 1071 | 96 | ≥0.92 | ST8-009-AW-NW-01F | Natural white | 967 | ST8-009-AW-W-01F | White | 982 | ST8-018-AW-WW-01F | Warm White | 120 | 18 | 2143 | 192 | ST8-018-AW-NW-01F | Natural white | 2031 | ST8-018-AW-W-01F | White | 2044 | ST8-022-AW-WW-01F | Warm White | 150 | 22 | 2315 | 240 | ST8-022-AW-NW-01F | Natural white | 2572 | ST8-022-AW-W-01F | White | 2594 | Clear | ST8-009-AW-WW-01C | Warm White | 60 | 9 | ≥80 | 1219 | 96 | ST8-009-AW-NW-01C | Natural white | 1111 | ST8-009-AW-W-01C | White | 1146 | ST8-018-AW-WW-01C | Warm White | 120 | 18 | 2680 | 192 | ST8-018-AW-NW-01C | Natural white | 2534 | ST8-018-AW-W-01C | White | 2514 | ST8-022-AW-WW-01C | Warm White | 150 | 22 | 2859 | 240 | ST8-022-AW-NW-01C | Natural white | 3175 | ST8-022-AW-W-01C | White | 3150 |
Installation information: Power must be cut off before installation, fix it on the position of installation holes, connection of the power supply must be sealed. 1.Please read the specification first, to make sure the service environment matches the condition in the specification before using. 2.Please confirm the applicable power supply before using. 3.Make sure the switch of product is off before connect to the power supply to prevent electric shock. 4.Operation against rules may damage your property even harm to your personal safety. 5.Preliminarily estimate required quantity of LED lights, then according to the power rating of single flood light to figure out the total power and design power supply plan. 6.Dangerous high voltage, Non-professionals are not allowed to maintain the products. If the exterior flexible cable or wire is damaged, it must exchange by the supplier, its agent or other similar qualified personnels to avoid dangers. | Name | Update date | Document size | Click here to Dowenload | | ST8 | 2014.7.14 | 1000KB | |
|
|
'