requirements | 1,Tank container should be designed according to GB/T16563-1996 |
| 2,The welding is arc welding,and meet the regulation of NB/T47015-2011 |
| 3,The corner fittings should meet GB/T1835-1995 |
| 4,After the building of container,it should be tested according to GB/T16513-1996 |
5,Into the hole, the relief valve and the valve cover the stainless steel bolts, stud should be set on the helmet for protection. |
| 6,Manual valves open and close action, should be able to un |