恒旺厂家直销装载式护栏打桩机公路护栏打桩机装载机改装高效优质
产品信息Product
information
装载式护栏打桩机介绍:
采用莱工或者山宇装载机,
型号有20型和30型、自动挡和手动挡可选择,柴油机是云内490发动机,37千瓦50马力,
可打桩,拔桩,钻孔,也可配带空压机一体机,也可左边打右边钻孔,
种类多多,欲了解更多,可以电话联系或者加微信,发工作视频和操作流程。
此款护栏打桩机卖点:
稳定性好,速度快。不做护栏工程了,装上铲斗还可以当做装载机铲车使用,一机两用。
Load type barrier pile driver
is introduced:
Using work or mountain yu loader,
Models have 20 and 30, automatic and manual
choice, diesel engine is 490 engine inside the cloud, 37 kw 50 HP,
Can pile, pile drawing, drilling, and can also
be equipped with air compressor machine can also be left on the right side of
the borehole,
Kinds of, for more, can call me or add WeChat,
send working video and operation process.
This barrier pile driver selling point:
Good stability and fast speed.Don't do fence
engineering, mount bucket also can be used as a loader forklift, one machine.
产品参数Product
parameters
型号model | HZH-360C |
发动机功率Engine
power | 37kw |
外型尺寸 (长×宽×高) Installation dimensions (length x width x height) | 2350mm×2200mm×3600mm |
整机重量The
weight | 2400kg |
液压锤质量Hydraulic
hammer quality | 180kg |
液压系统压力The
hydraulic system pressure | 16Mpa |
液压系统流量The
hydraulic system flow | 30-55ml/r |
冲击压力Shock
pressure | 10-13Mpa |
冲击频率The
impact frequency | 5.8-13Hz |
液压锤工作高度Hydraulic
hammer work height | 700-2700mm |
优势advantage:
1、打桩效率更快,更高,节省了施工时间,降低了人工成本。
2、打桩机摒弃了以往的传统结构,采用框架结构,使用国标钢材,打桩机的底盘更结实稳固,更能抵抗施工时的震动。
3、自行设计制造的加大散热器,大大提高了整体液压系统的散热能力。
4、独特的专利技术,使得在工地上的转场运输非常方便,比同类设备至少要缩短2-3小时。
5、自行研发打拔钻一体的专利技术,降低了购买成本,提高了施工效率,有效的解决了打桩时需要拔桩的难题。
6、可以装配双缸的柴油机,马力更大,运转更稳定,省去了找水,装水,放水的苦恼。
7、桩机出厂全部装配有脚刹及手刹,刹车方便有效,更加适合山区的施工,提高了山区施工的安全性及效率。
1, the efficiency of pile
driving faster, higher, save the construction time, reduce the labor costs.
2, pile driver abandoned the previous
traditional structure, adopt the frame structure, use gb steel, pile drivers
more solid solid chassis, in construction of more resistant to vibration.
3, design and manufacture of radiator, greatly
improving the whole hydraulic system cooling capacity.
4, the unique patented technology, made at the
site of ferry transportation is very convenient and shorter than the same kind
equipment for at least 2 to 3 hours.
5, to develop a drill of patent technology,
reduce the purchase cost and improve the construction efficiency, effectively
solves the problem of the need when driving piles.
6, can assemble two-cylinder diesel engine,
greater horsepower, more stable operation, saves water, water, water woes.
All seven, pile machine factory equipped with
foot and hand brake, the brake is convenient and effective, more suitable for
the construction of the mountain, to improve the security and efficiency of
mountainous region construction.